In compliance with ERC Resolution No. 08, Series of 2023, "A Resolution Adopting the Procurement Guidelines for the Regulated Transmission and Distribution Assets of Regulated Entities".
Materials or services to be procured | Invitation to Bid | Submit Letter of Intent by |
Status |
Line Tools and Equipment | 2024-064 | 2024-12-05 | |
San Miguel PNR Road Area Regravelling | 2024-063r | 2024-12-05 | |
San Miguel PNR Road Area Regravelling | 2024-063 | 2024-12-03 | |
Civil Works/ Concreting of Road Portion of SBSS Construction Project | 2024-062 | 2024-12-03 | |
One Brand New Isuzu Dmax LT 4x2 MT Model 2024 | 2024-061r | 2024-12-05 | |
One Brand New Isuzu Dmax LT 4x2 MT Model 2024 and One Brand New Isuzu Traviz L UV Model 2024 | 2024-061 | 2024-11-22 | |
Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-060 Bid Bulletin 2024-060-1 |
2024-11-21 | |
Trimming. Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-059-1 | 2024-11-14 | |
Trimming. Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-059 Bid Bulletin 2024-059-1 |
2024-11-14 | |
Line Tools and Equipment | 2024-058r | 2024-11-18 | Concluded |
Line Tools and Equipment | 2024-058 | 2024-11-13 | Concluded |
VFL Conference Hall Improvement |
2024-057 Bid Bulletin 2024-057-1 |
2024-10-21 | Concluded |
Construction of Two Storey Control Room Building Extension and Refurbishment of the Old Tower Building |
2024-056 Bid Bulletin 2024-056-1 |
2024-10-21 | Concluded |
Construction of Covered Structure |
2024-054-055 Bid Bulletin 2024-054-055-2 |
2024-10-11 | Concluded |
Construction of Covered Structure |
2024-055 Bid Bulletin 2024-054-055-1 |
2024-10-11 | Concluded |
Bacayao Lot Extension Development Project |
2024-054 Bid Bulletin 2024-054-055-1 |
2024-10-11 | Concluded |
Bacayao Cottages Area Rehabilitation Project |
2024-053 Bid Bulletin 2024-053-1 |
2024-10-11 | Concluded |
Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-052 Bid Bulletin 2024-052-1 |
2024-10-03 | Concluded |
Toyota Innova Model 2024 | 2024-051r | 2024-09-27 | Concluded |
Toyota Innova Model 2024 | 2024-051 | 2024-09-24 | Concluded |
Network Switch | 2024-050r | 2024-10-07 | Concluded |
Network Switch | 2024-050 | 2024-09-24 | Concluded |
Network IP Camera | 2024-049r | 2024-10-07 | Concluded |
Network IP Camera | 2024-049 | 2024-09-24 | Concluded |
Laptop | 2024-048r | 2024-10-07 | Concluded |
Laptop | 2024-048 | 2024-09-24 | Concluded |
Current and Potential Transformer Tester |
2024-047 Bid Bulletin 2024-047-1 |
2024-09-23 | Concluded |
Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-046 Bid Bulletin 2024-046-1 |
2024-09-16 | Concluded |
Service Vehicle | 2024-045 | 2024-09-10 | Concluded |
Laboratory Equipment – Power Quality Analyzer |
2024-044r Bid Bulletin 2024-044r-1 |
2024-09-24 | Concluded |
Laboratory Equipment – Power Quality Analyzer | 2024-044 | 2024-09-10 | Concluded |
Lot Backfilling | 2024-043r | 2024-09-13 | Concluded |
Lot Backfilling | 2024-043 | 2024-09-10 | Concluded |
Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-042 Bid Bulletin 2024-042-1 |
2024-09-02 | Concluded |
Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-041 Bid Bulletin 2024-041-1 |
2024-08-21 | Concluded |
Dot Matrix Printers and Network Cables | 2024-040r | 2024-08-21 | Concluded |
Dot Matrix Printers and Network Cables | 2024-040 | 2024-08-16 | Concluded |
Brand New Toyota Hilux Model 2024 | 2024-039r | 2024-07-30 | Concluded |
Brand New Toyota Hilux Model 2024 | 2024-039 | 2024-07-25 | Concluded |
Brand New Suzuki S-Presso Model 2024 and Suzuki Carry UV Model 2024 |
2024-038 Bid Bulletin 2024-038-1 | 2024-07-25 | Concluded |
Replacement of VFL Second Floor Quarters Damaged Wood Floors to Tiles | 2024-037 | 2024-07-22 | Concluded |
Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-036 Bid Bulletin 2024-036-1 Bid Bulletin 2024-036-2 |
2024-08-01 | Concluded |
External Hard Drive | 2024-035 | 2024-06-30 | Concluded |
Line Tools and Equipment | 2024-034r | 2024-07-11 | Concluded |
Line Tools and Equipment | 2024-034 | 2024-06-30 | Concluded |
Digital Two-Way Mobile Radios and Portable Radio | 2024-033r | 2024-07-11 | Concluded |
Digital Two-Way Mobile Radios and Portable Radio | 2024-033 | 2024-06-30 | Concluded |
Line Tools and Equipment | 2024-032 | 2024-06-21 | Concluded |
Line Tools and Equipment | 2024-031 | 2024-06-21 | Concluded |
Line Tools and Equipment | 2024-030r | 2024-07-11 | Concluded |
Line Tools and Equipment | 2024-030 | 2024-06-21 | Concluded |
Line Tools and Equipment | 2024-029 | 2024-06-21 | Concluded |
Line Tools and Equipment | 2024-028r | 2024-07-08 | Concluded |
Line Tools and Equipment | 2024-028 | 2024-06-21 | Concluded |
Optical Time Domain Reflectometer | 2024-027r | 2024-06-21 | Concluded |
Optical Time Domain Reflectometer | 2024-027 | 2024-06-17 | Concluded |
Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp |
2024-026 Bid Bulletin 2024-026 |
2024-06-17 | Concluded |
Primary Line Extension with Line Revamp | 2024-025 | 2024-05-22 | Concluded |
69kV Line Construction of Balingueo – Macabito – San Miguel Line |
2024-024 Bid Bulletin 2024-024 |
2024-05-22 | Concluded |
Customer Accounting Section (CAS) Office Partition |
2024-023 Bid Bulletin 2024-023 |
2024-05-22 | Concluded |
Concreting of Bacayao Vehicle Wash Area | 2024-022 | 2024-05-22 | Concluded |
Trimming, Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-021 | 2024-05-14 | Concluded |
Streetlight | 2024-020 | 2024-05-08 | Concluded |
Line Equipment and Accessories | 2024-019r | 2024-06-10 | Concluded |
Line Equipment and Accessories | 2024-019 | 2024-05-08 | Concluded |
Insulators |
2024-018r Bid Bulletin 2024-018-1 Bid Bulletin 2024-018-2 |
2024-07-08 | Concluded |
Insulators |
2024-018 Bid Bulletin 2024-018-1 Bid Bulletin 2024-018-2 |
2024-06-26 | Concluded |
Pole Line Hardware | 2024-017r | 2024-06-02 | Concluded |
Pole Line Hardware | 2024-017 | 2024-04-29 | Concluded |
Connectors and Electrical Tape | 2024-016r | 2024-06-10 | Concluded |
Connectors and Electrical Tape | 2024-016 | 2024-04-29 | Concluded |
Concrete and Steel Poles | 2024-015r | 2024-06-02 | Concluded |
Concrete and Steel Poles | 2024-015 | 2024-04-29 | Concluded |
Wire Conductors | 2024-014r | 2024-06-02 | Concluded |
Wire Conductors | 2024-014 | 2024-04-29 | Concluded |
Wireless Access Point | 2024-013r | 2024-05-08 | Concluded |
Wireless Access Point | 2024-013 | 2024-04-18 | Concluded |
Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-012 | 2024-04-14 | Concluded |
Trimming | 2024-011 | 2024-04-02 | Concluded |
Current Transformer and Potential Transformer | 2024-010 | 2024-04-02 | Concluded |
Polyphase Electricity Meters | 2024-009r | 2024-04-24 | Concluded |
Polyphase Electricity Meters | 2024-009 | 2024-04-02 | Concluded |
Single Phase Electricity Meters | 2024-008 | 2024-04-02 | Concluded |
Various Metering Accessories | 2024-007r | 2024-04-29 | Concluded |
Various Metering Accessories | 2024-007 | 2024-03-24 | Concluded |
Line Tools and Equipment | 2024-006r | 2024-04-29 | Concluded |
Line Tools and Equipment | 2024-006 | 2024-03-20 | Concluded |
Installation of Distribution Transformers, Primary and Secondary Line Extension with Line Revamp | 2024-005 | 2024-03-14 | Concluded |
Wire Conductors and Cables | 2024-004r | 2024-03-26 | Concluded |
Wire Conductors and Cables | 2024-004 | 2024-03-14 | Concluded |
Single Phase Distribution Transformers | 2024-003r | 2024-03-25 | Concluded |
Procurement of Single Phase Distribution Transformers | 2024-003 | 2024-03-10 | Concluded |
Trimming under 69 KV Sub-Transmission Line | 2024-002r | 2024-03-15 | Concluded |
Trimming | 2024-002 | 2024-02-29 | Concluded |
Installation of Distribution Transformers and Primary Line Extension with Secondary Line Extension | 2024-001r | 2024-03-13 | Concluded |
Installation of Distribution Transformers and Primary Line Extension with Secondary Line Extension |
2024-001 Bid Bulletin 2024-001 |
2024-02-22 | Concluded |